Bull Float


Description

Bull floating should be done immediately after screeding, or after the concrete has been tamped, to level ridges and fill voids left by the screeding operation.

Width 1200mm
Depth 200mm

Size 24 Hour Rate 2 Day Rate 3 Day Rate Week Rate Weekend Rate
£18.72 £27.04 £31.20 £39.52 £20.80