Bull Float
BackBull Float
Description
Bull floating should be done immediately after screeding, or after the concrete has been tamped, to level ridges and fill voids left by the screeding operation.
Width 1200mm
Depth 200mm
Size | 24 Hour Rate | 2 Day Rate | 3 Day Rate | Week Rate | Weekend Rate |
---|---|---|---|---|---|
£18.72 | £27.04 | £31.20 | £39.52 | £20.80 |